A new septic system, or a full replacement, is a permitted construction job. In Hamilton County it starts with Groundwater Protection, not with digging. The county is a TDEC contract county, which means you deal with the county's program rather than a TDEC field office for the permit itself. This is a referral service. A local septic professional gets in touch about your request. Installers who do this work in Hamilton County need a county septic installer license. Any price, schedule, or design comes from that provider and from the permit, not from this site.

When you might need it

When you are building a house, shop, or barn that will not connect to sewer; when an existing system has failed and needs to be replaced; or when a conventional field is no longer a fit and the lot needs an alternative system such as LPP or a mound system. The county treats both a new conventional system and a new alternative system as a New Septic Permit. If you are only repairing part of an existing system, or adding field lines or bedrooms, see septic repair, field line and drain field repair, and Hamilton County septic permits. Those jobs often use a Repair or Modification permit instead.

What is included

  • Help figuring out whether the lot is a candidate for a new or replacement system, and who to call at the county.
  • Coordination, by the provider, with soil work and the permit package the county requires.
  • Installation by a licensed installer, on that installer's own terms, after the permit is in hand.

Pricing guidance

Guidance only, never a quote. The county's New Permit fee is $440.00 (Development Services fee list, checked Nov 20, 2026). That is the permit fee, not the cost of the system. Angi published 2026 national figures for replacing a septic tank and drain field: a national average of $6,000, with most homeowners paying between $5,000 and $12,000, and a national average of $12,000 for a mound drain field. Those are national figures, not a Chattanooga installed price. Confirm the cost with the provider after the lot and the system type are known.

The county permit, in outline

Applications have been online only since March 11, 2024. Groundwater Protection is at 1250 Market Street, Suite 3046, Chattanooga, TN 37402. Phone 423-209-7876. Email gwp@hamiltontn.gov. Hours are 8 to 4:00 PM. The county asks you to arrive by 3:30 PM if you are applying in person for a permit or taking an installer test, though routine applications go through the online process.

The county's new-permit form asks for house dimensions, bedroom count, basement plumbing, and the water supply, and it asks you to call or email when the house site is staked. A soils map prepared by a soil scientist certified by the department is part of a complete package in the state's third-party process, and the county may require a soils map in other cases too. Ask Groundwater Protection what your application has to include.

If the property can connect to a public sewer instead, that is a different path. For a street connection question, the county points people to WWTA at 423-209-7842. Inside the City of Chattanooga, sewer questions go to the city (311 or (423) 643-6311).

Third-party engineers and certified soil scientists

Beginning October 1, 2024, Tennessee law gives you another way to put a permit package together. Under Tennessee Code Annotated 68-221-403(m)(2), a person may engage a third-party water resources engineer to prepare a permit package in lieu of the department or the contract county, and submit it to Hamilton County in the form the county requires. Under 68-221-403(m)(12), a soil scientist certified by the department may submit an application for a system with a capacity of less than 750 gallons per day, including the application, fee, proposed design, soils map, and a completed but unsigned permit. A third-party water resources engineer may also conduct the final inspection, with the certificate-of-completion package due no more than five business days after the inspection (68-221-403(m)(3)).

TDEC says packages for sites in contract counties, including Hamilton, should be submitted directly to the contract county. The department or the county then has ten business days after receipt to approve the package, reject it with a deficiency report, or ask for more information. None of that removes the need for a county permit. It changes who may prepare and inspect the work.

Not sure what your lot needs? Just ask. Call (423) 225-8134 or send a request.

Related reading

Related services

Areas we serve

FAQ

How much is the county permit for a new septic system?

$440.00 for a New Permit, on the live Groundwater fee list checked Nov 20, 2026. A modification of an existing system is also $440.00. Those amounts are permit fees, not installation prices.

Can I use an engineer or a soil scientist instead of waiting on the county to design the system?

Starting October 1, 2024, a registered third-party water resources engineer may prepare the permit package, and a department-certified soil scientist may submit an application for a system under 750 gallons per day, as described in TCA 68-221-403(m) and on TDEC's third-party permits page. The package still goes to Hamilton County, because Hamilton is a contract county.

Who is allowed to install the system?

Installers are required to have a Hamilton County septic installer license. If they already hold a state installer permit, they still apply and pay the county fee, but they are not required to take the county test. The county license is good for one year. The county publishes a list of licensed installers and pumpers.